Abstract:Aiming at the problem of overload operation of airport runway, the operation sorties of overloaded aircraft are planned. The aircraft load, pavement bearing capacity and aircraft sorties are analyzed, and the integer programming model of airport runway overload use is constructed according to the overload use criterion and applied to a case. The results show that the plan can solve the problem of sortie management of various aircraft types in overload operation and ensure the rational use of runway resources.