Abstract:In order to solve the flaw of measure and control system in the wind Tunnel, technology alteration has been made. This paper introduces the main technical indexes, general design scheme, equipment debugging and application after the technology alteration. After some wind tunnel tests are finished, it has been proved that the design scheme of the new system is reasonable, its performance is stable, reliable, the expected effect has been satisfied, and the technology alteration has some application value.